The Project will be physically located in/near the Belfair Urban Growth Area.
The first phase will be to construct a switching station at the former PUD 3 Belfair Warehouse (21341 E State Route 3). There will also be a future transmission line from here, generally following the Bonneville Power Administration (BPA) utility corridor along Clifton Ridge, to a future substation location near the Belfair Water District water tower and Log Yard Road.