From January 2026 to October 2026, PUD 3 bills will have a “Temporary BPA Power Adjustment” surcharge from Bonneville Power Administration. For the sake of transparency, this will appear as a separate line item. For the first nine months, the total will be $1.63. In October, PUD 3 will charge the exact amount needed to fulfill BPA’s requirement. The total will be similar for that month but could be slightly higher or lower.
BPA has said it will implement a $40 million surcharge shared across its many utility customers to rebuild financial reserves depleted by lower revenue the last few years. This is the second time BPA has implemented this surcharge. Read more about this on BPA’s Newsroom webpage.
Applicable to single family residences and separately metered apartment units for domestic, seasonal or recreational use, incidental power service, unmetered services, and single-phase well services. This schedule is not applicable to sale for resale which is prohibited by Mason PUD 3 (PUD 3).
Applicable only to current qualified low income disabled or current qualified low-income senior customers in single family residences and separately metered apartment units for domestic power service. Several eligibility requirements must be met to be considered qualified. This schedule is not applicable to sale for resale which is prohibited by PUD 3. This schedule is no longer available except to customers qualified and receiving service under this schedule on the effective date and so long thereafter as such status does not terminate. This schedule is no longer otherwise available.
Applicable to single metered commercial and individual consumers including schools, churches, granges, community halls, public agencies, three-phase well services, unmetered services and other consumers with usage under 15,000 kWhs in any month and a demand of 50 kW or less in all months. Also applicable to all unmetered PUD 3 contractor job shack electrical hookups to PUD 3 facilities (if located on private or public property, consent of the controlling authority is to be obtained by the contractor). This schedule is not applicable to sale for resale which is prohibited by PUD 3.
Applicable to single metered commercial and individual consumers including schools, churches, granges, community halls, public agencies, three-phase well services and other consumers with consumption greater than 15,000 kWhs in any month or a demand greater than 50 kW in any month. This schedule is not applicable to sale for resale which is prohibited by PUD 3.
Applicable to all services consuming electricity for purposes of producing or processing cannabis as authorized under Washington State law. To include all applications for service with load associated with such producing or processing activities. Customers qualifying for this rate schedule are not eligible for federally funded conservation or other financial assistance provided through the BPA. This schedule is not applicable to sale for resale which is prohibited by PUD 3.
Applicable to all publicly available electric vehicle charging equipment that is metered separately from other loads not primarily associated with the charging of electric vehicles and whose total connected load does not exceed 0.5 MW. Participation in this rate schedule is optional and eligible customers may choose to participate at any time. Customers who transfer from this rate schedule will not be eligible to participate for a 12-month period following the date of their exit. This schedule is not available for service to seasonally disconnected loads.
Applicable to all consumers for security lighting or unmetered signs at any location on the property of the consumer or an adjacent or related public property provided that consent of the public authority controlling such public property be obtained. HPS Luminaires and unmetered sign service are no longer available except to customers who already have those services.
Applicable to the City of Shelton for security lighting, at any location on public rights-of-way provided that consent of the public authority controlling such public property be obtained.
Applicable to load associated with a new facility, existing facility not served by PUD 3, or an expansion of an existing facility which will result in an increase in power capacity to PUD 3 of 0.5 aMW or more over any consecutive 12-month period, or 1 MW of demand or more over any consecutive 12-month period. PUD 3, at its sole discretion, will make a determination as to what constitutes a facility for purposes of identifying a New or Expanding Large Load (NELL). All consumers being served under this rate schedule will be required to enter into a contract with PUD 3 before delivery of electric service begins.
If a load associated with a new facility, an existing facility not served by PUD 3, or expansion of an existing load was initially determined by PUD 3 to not be a NELL and was billed under the applicable rate schedule, but such load is later determined by PUD 3 to be a NELL, then PUD 3 will begin billing such load consistent with this rate schedule and will require the NELL to enter into a contract with PUD 3.
Once a load associated with a new facility, an existing facility not served by PUD 3, or expansion of an existing load was determined by PUD 3 to be a NELL, such load will continue to be treated as a NELL even if such load decreases over time. This schedule is not applicable to sale for resale which is prohibited by PUD 3.