New Construction & Remodeling

PUD 3’s engineering department can help energize your dreams. If you have any questions about this process, please call us at (360) 426-0888, or visit us at the Johns Prairie Operations Center.

Alert: Material Shortages & Supply Chain Crisis Causing Delays

The electrical industry is facing a nationwide supply chain crisis. While full payment for a customers proposal will secure today’s pricing, it does not guarantee that material is available when the customer is ready. Workorders released material packaging will be prioritized by material availability, amount/type of material required, and customer readiness. All of this means that construction schedules may be severely delayed. Read more about our Material Shortages and Supply Chain Crisis.

Install New Electrical Service

close up of person installing new electrical serviceTo have electricity installed to your property you’ll submit an application for new service.

You can find a list of PUD 3's Engineering Specifications & Policies and our Service Rules & Regulations in the Document Archives.

PUD 3 Documents

What You Need For Installation of New Electrical Service

  • Application Fee (see Fee Schedule A (PDF) for current fees) - Application fees can be paid for with cash, check,  Visa or Mastercard. Application Fees are applied to the cost of the extension project that is carried forward to completion. Note: Application Fees are non-refundable.
  • Application for Credit (unless you have previously completed the Application for Credit with PUD 3).
  • Copy of Building Permit and Approval Number from the State Electrical Inspector are required, but not necessary to submit application for estimate.
  • Plot Plan of Development or Drawing of Property (Need location of septic, poles, mobile, home (entrance), and temporaries).
  • New Service Address prior to connection of power.
  • Copies of current recorded deed or current recorded contract of sale and parcel number for property.
  • Property corners clearly marked.

Cost

PUD 3’s engineering staff is specially trained to design a safe, legal, and cost-effective plan to connect your new home or business to PUD 3’s clean, reliable electric grid. Because there are so many variables, we do not give “rough estimates” for specific jobs.

All customers must submit an application for electrical service in order to receive a cost estimate.

This handout may offer a better explanation.

Meter Placement

Where's the best place to place your meter?

  • PUD 3 must have access to the meter every month.
  • The meter base must be installed on the outside of the building, where it’s easy to get to.
  • Don’t put the meter base in these locations:
    • Over 5 feet off the ground
    • In a carport or other places that may be enclosed later.
    • In the same area that your dog will be kept.
    • Anywhere you want absolute privacy.

Don't Tamper With The Meter

Customers who have disconnected or reconnected their power without proper authorization and/or have tampered with the meter, or had their seals cut will be billed a minimum tampering fee plus actual costs. (See the Fee Schedule A for current meter tampering fees).

Remodeling, Adding, or Changing Your Electrical Load

overhead view of people looking at plansIf you're adding or changing your electrical load, we need to know to make sure you get the power needed.

This includes remodeling, changing out your electrical panel, or changing the type of electrical service to your property. Before you or your electrician do the work, please fill out an application for altered service. Depending upon the complexity of the job and number of applications we’re working on, this may take between 2 and 8 weeks, so plan ahead.

You can find a list of PUD 3's Engineering Specifications & Policies and our Service Rules & Regulations in the Document Archives.

PUD 3 Documents

What You Need to Make an Application for a Change to Your Service

  • Application for altered service/added load.
  • Application for Credit if the PUD 3 account isn’t in your name (unless you have previously completed an Application for Credit).
  • A copy of the Building Permit and Approval Number from the State Electrical Inspector are required, but not necessary to submit application for estimate.
  • Plot Plan of Development or Drawing of Property (Need location of septic, poles, mobile, home (entrance), and temporaries).
  • Copies of current recorded deed or current recorded contract of sale, and parcel number for property.
  • Clearly marked parcel corners.

Cost

PUD 3’s engineering staff is specially trained to design a safe, legal, and cost-effective plan to connect your new home or business to PUD 3’s clean, reliable electric grid. Because there are so many variables, we do not give “rough estimates” for specific jobs.

All customers must submit an application for electrical service in order to receive a cost estimate.

This handout may offer a better explanation.

Conservation Rebates During Remodeling

PUD 3 may have rebates available for upgrading the energy efficiency of your home or equipment during a remodel. Call the Conservation Department at (360) 426-0777 to learn more.

NOTE: If your remodel requires a permit to bring the building up to code, some rebates may not apply.

Meter Placement

Where's the best place to place your meter?

  • PUD 3 must have access to the meter every month.
  • The meter base must be installed on the outside of the building, where it’s easy to get to.
  • Don’t put the meter base in these locations:
    • Over 5 feet off the ground
    • In a carport or other places that may be enclosed later.
    • In the same area that your dog will be kept.
    • Anywhere you want absolute privacy.

Don't Tamper With The Meter

Customers who have disconnected or reconnected their power without proper authorization and/or have tampered with the meter, or had their seals cut will be billed a minimum tampering fee plus actual costs. (See the Fee Schedule A for current meter tampering fees).

Large Load Power Inquiry

datacenterLarge power loads can be tricky to serve. In addition to appropriate distribution facilities and the correct rate schedule, we also need to be sure BPA can deliver the energy requested.

If you have questions about Mason PUD 3 Electric Service in a high density or large load application, please call (360) 426-0888 to initiate a discussion about your needs.

If you are a residential or small commercial customer please refer to information about your new or upgraded service.